Negligible erosion from heavy rain. Good BMPs prevent sediment discharges.
Categories:
Best Construction Sites Site: Hamilton Blvd Project, Mobile County, Alabama
Contractor: Hosea O. Weaver and Sons, Inc
Example of good BMPs that prevented disturbed soil from discharging sediment pollution into Dog River Waterbasin during heavy rains (Over 2 inches) the day before.
Well anchored mulch kept soil loss to a minimum and the well constructed Type-A silt fence provided additional protection from erosion.
Well done BMPs!
Location:
AL30° 33' 16.8084" N, 88° 9' 41.7528" W

