Gaston Mall Redevelopment 1-19-11 Lack of control in stormwater transfer and Hydroseeding
Categories:
Sediment Leaving Construction Site Northeast corner of site - see previous MWW reports for Gaston Mall Redevelopment. No rain on this day, however, operations on site either transferring stormwater or surface water and operation of a hydro-seeder cause run-off with sediment to leave the active part of the site and drain to an existing catch basin in a previously paved area.
Location:
NC35° 14' 57.84" N, 81° 8' 13.92" W

